KNPC Clean Fuels
Project
Scope of work included:
- Detail Engineering
- Technical Bid
Preparation and evaluation
- Procurement
assistance
- Vendor document
review and approval
- HAZOP, SIL review
Ergonomic study QAR study
- FAT & SAT Activity,
3D Model Review
Facilities covered under
Scope of work:
- LPG Treating Unit
- Delayed Coker –
Naphtha Hydrotreater Unit
- Gas Oil
Desulfurization
- DIP (De-
isopentanizer)
- DIB (De-
isobutanizer)
- Existing New Oil
Pier, Eocene Topping Unit
- Gas Plant HP
Hydrocarbon Flare
- Sulfur Tanks, LPG
Train 1, LPG Train 2, LPG Train 3
- Isomerization Unit
(New), Hydrogen Production Unit (HPU),
Underground Piping
- Interconnecting
Pipe ways, Eocene Topping Unit Flare
- Sea Water Cooling,
IC5 Merox Unit