Liwa Plastic Industries Complex

 
  • Project Name: – Liwa Plastic Industries Complex PKG – 3 (LPIC-3)
  • Client: – ORPIC
  • Location: – Fahud, the Sultanate of Oman

Liwa Plastic Industries Complex PKG – 3 (LPIC- 3)


Scope of work included:
  • FEED Verification, DetailEngineering
  • Preparation of technicalspecification
  • Technical Bid Preparation andevaluation
  • Procurement assistance
  • Vendor document review andapproval
  • HAZOP, SIL review Ergonomic studyQAR study
 
Facilities covered under Scope of work:
  • NGL Extraction Unit, NGL feedTreatment Unit, NGL Extraction train
  • NGL Lean Gas Export Unit, NGL ExportUnit, NGL Lean gas Export unit
  • NGL refrigeration Unit, Lean GasCustody Flow metering Unit
  • Reach Gas Custody Flow meteringUnit
  • Emergency Power Unit
  • Potable and Service water Unit
  • Fuel Gas and Natural Gas SupplyUnit
  • Methanol Storage and injectionUnit
  • Waste water treatment Unit, DenimWater Unit
  • Instrument Air and Plant Air Unit-Utilities and Offsite Units@FAHUD
  • Nitrogen Unit – Utilities and OffsiteUnits@FAHUD
  • Hot Oil Unit, Refrigeration Unit
  • Warm flare Unit’, Cold flare &flare stack
 

  BACK