New Water Centre (NWC)
Scope of work included:
- FEED Verification, Detail Engineering
- Preparation of technical specification
- Technical Bid Preparation and evaluation
- Procurement assistance
- Vendor document review and approval
- HAZOP, SIL review Ergonomic study QAR study
Facilities covered under Scope of work:
- Brackish water & Potable water pipeline distribution networks,
- Brackish & Potable water Supply lines & tie ins,
- High Pressure sea water injection line,
- Isolation valve pit (18 nos) for network controlling,
- future connection and vacuum truck connection
- Pipeline length: 220 km Pipeline Network